Price Guide (Design Wind Speed – Region C – 54 m/s)
Turnkey Option $140,000.00 - $160,000.00
Scope Turnkey Option
Standard Building Approval
Section 40 – Site Specific Engineering (BCA Class 10a)
Professional Built including Shed Slab (Perimeter Beam Design - 32 mpa 120mm thick with integrated pad footings)
Earthworks – Slab Preparation
Delivery Darwin Area
Site Clean Up
Options
Vermin Flashing
Roof Ventilation – Whirly Birds
Windows & Sliding Glass Doors
Insulation – Roof Only or Roof & Walls
Extendable End Frames
Concrete upgrades for car hoists etc
Shed upgrade for Solar.
Electric Garage Door Openers
Plumbing
Electrical
DIY Option $58,950.00 - $70,000.00
DIY Scope
Section 40 – Site Specific Engineering (BCA Class 10a)
Site Plan
Delivery Darwin Area
Comprehensive Construction Manual
Technical Phone Support